The Three Rivers 139-foot water tower, located on Broadway, is sporting a new coat of paint. Fedewa, a firm located in Hastings, was awarded the $122,000 contract. Engineering costs totaled $13,000. The tower, which was constructed in 1964, is repainted, on an average, every 15 years.
Check Also
Sturges-Young has new director
The Sturges-Young Center for the Arts has a new director. At least, on an interim …
WLKM Radio 95.9 FM
