The Three Rivers 139-foot water tower, located on Broadway, is sporting a new coat of paint. Fedewa, a firm located in Hastings, was awarded the $122,000 contract. Engineering costs totaled $13,000. The tower, which was constructed in 1964, is repainted, on an average, every 15 years.
Check Also
Membership in SWMLC funds multiple projects
Southwest Michigan Land Conservancy is issuing its annual, end-of-year appeal in support of the Galesburg-based …
WLKM Radio 95.9 FM
